Title
Engineering design contract amendment no. 3 for Padre Island Water Supply Study
Motion authorizing the City Manager, or designee, to execute Amendment No. 3 to an Engineering Design Contract with Urban Engineering from Corpus Christi, Texas in the amount of $141,323, for a total re-stated fee of $738,539, for the Padre Island Water Supply Study for the extension of the 8-inch diameter gas line from the termination point of the Padre Island Water Supply project to Aquarius Street.