File #: 21-0492    Version: 1 Name:
Type: Presentation Status: Filed with the City Secretary
File created: 4/9/2021 In control: City Council
On agenda: 6/15/2021 Final action: 6/15/2021
Title: North Beach Canal Project Report by Lockwood, Andrews, and Newman Inc on Phase II services which includes probable cost estimates for the three drainage solution options (closed conduit system, open linear park channel, navigable canal) for North Beach.
Sponsors: Engineering Services
Attachments: 1. Briefing Memo - North Beach Navigable Canal Final

title

North Beach Canal Project Report by Lockwood, Andrews, and Newman Inc on Phase II services which includes probable cost estimates for the three drainage solution options (closed conduit system, open linear park channel, navigable canal) for North Beach.