File #: 24-0435    Version: 1 Name:
Type: Motion Status: Passed
File created: 3/12/2024 In control: City Council
On agenda: 5/14/2024 Final action: 5/14/2024
Title: Motion authorizing a cost-share agreement with the U.S. Army Corps of Engineers (USACE) for design and construction to address streambank erosion control related to the Mary Rhodes Pipeline Phase 2 System Improvements project, located in the vicinity of the Mary Rhodes Pump Station near Bay City, in an amount not to exceed $4,629,100, with FY 2024 funding available from the Water Capital Fund and funding in the amount of $8,596,900 available from the USACE. The total projected cost for the streambank erosion improvement is estimated to be approximately $13,676,000, including phase one feasibility study.
Sponsors: Engineering Services, Water Utilities Department
Attachments: 1. Agenda Memo -MRPII - USACE Cost Share Agreement 5-2024 (002), 2. 19025A - Maps, 3. 19025 - CIP Adopted Budget FY23-24, 4. Certificate of Authority_Mary Rhodes Pump Station, 5. Certificate Regarding Lobbying_Mary Rhodes Pump Station, 6. Executed PPA as Modified by Proposed Amendment_Clean Version, 7. Self-Certiciation of Finanical Capability for Agreements_City of Corpus Christi_Mary Rhodes Pump Station, 8. Phase II Presentation

title

Motion authorizing a cost-share agreement with the U.S. Army Corps of Engineers (USACE) for design and construction to address streambank erosion control related to the Mary Rhodes Pipeline Phase 2 System Improvements project, located in the vicinity of the Mary Rhodes Pump Station near Bay City, in an amount not to exceed $4,629,100, with FY 2024 funding available from the Water Capital Fund and funding in the amount of $8,596,900 available from the USACE. The total projected cost for the streambank erosion improvement is estimated to be approximately $13,676,000, including phase one feasibility study.