File #: 24-1692    Version: 1 Name:
Type: Resolution Status: Passed
File created: 10/2/2024 In control: City Council
On agenda: 10/22/2024 Final action: 10/22/2024
Title: Resolution rejecting the bids of IECON, Inc. and Taknek, LLC as non-responsive and authorizing a construction contract with H&S Constructors, Inc, Corpus Christi, TX as the lowest responsive, responsible bidder in the amount of $12,174,975.00 for the Mary Rhodes Pipeline Phase 1 System Improvements Project for improvements to the booster pump stations located at Bloomington, Texas and Woodsboro, Texas associated with the Mary Rhodes Pipeline (MRP) raw water delivery system, with FY 2025 funding available from the Raw Water Capital Fund. (6 Votes Required)
Sponsors: Corpus Christi Water, Engineering Services, Contracts and Procurement
Attachments: 1. E13037 Mary Rhodes Pipeline Phase 1 REBID - Agenda Memo.pdf, 2. Resolution - Nonresponsive bid - Experience_, 3. E13037 REBID - Bid Tab, 4. E13037 CIP Page.pdf, 5. E13037 Map.pdf, 6. CCW MRP Project Rebid DRAFT V4 10.22.pdf

Title

Resolution rejecting the bids of IECON, Inc. and Taknek, LLC as non-responsive and authorizing a construction contract with H&S Constructors, Inc, Corpus Christi, TX as the lowest responsive, responsible bidder in the amount of $12,174,975.00 for the Mary Rhodes Pipeline Phase 1 System Improvements Project for improvements to the booster pump stations located at Bloomington, Texas and Woodsboro, Texas associated with the Mary Rhodes Pipeline (MRP) raw water delivery system, with FY 2025 funding available from the Raw Water Capital Fund. (6 Votes Required)