File #: 21-1387    Version: 1 Name:
Type: Public Hearing / First Reading Status: Passed
File created: 9/28/2021 In control: City Council
On agenda: 10/26/2021 Final action: 11/9/2021
Title: Ordinance amending the Wastewater Collection System Master Plan for the Allison Service Area, a public utility element of the Comprehensive Plan of the City of Corpus Christi, by adjusting the boundary line between basins 37 and 40, adding 15 acres to basin 40, with the subject area located on the southside of Northwest Boulevard (FM 624) between FM 1889 and CR 69.
Sponsors: Planning and Community Development Department, Utilities Department
Attachments: 1. Agenda Memo - Allison WWMP AMD.pdf, 2. Ordinance - Allison WWMP AMD.pdf, 3. Map of Allison Service Area Boundary from COCC Utilities Dept, 4. Subject Basins from COCC Utilities Dept, 5. Amendment by applicant Urban Engineering, 6. Capacity Study of Basin 40 by applicant Urban Engineering, 7. Presentation - Allison WWMP Amendment CC 10.26.21 dm 10.18.21.pdf

title

Ordinance amending the Wastewater Collection System Master Plan for the Allison Service Area, a public utility element of the Comprehensive Plan of the City of Corpus Christi, by adjusting the boundary line between basins 37 and 40, adding 15 acres to basin 40, with the subject area located on the southside of Northwest Boulevard (FM 624) between FM 1889 and CR 69.