Title:
|
Engineering Design Contract for Padre Island Water and Gas Pipeline Extension Phase 3 (Requires 2/3 vote)
Motion authorizing the City Manager, or designee, to execute an engineering design contract with Urban Engineering of Corpus Christi, Texas in the amount of $197,833 for the Padre Island Water and Gas Pipeline Extension Phase 3 for design, bid and construction phase services.
|