File #: 18-0940    Version: 1 Name:
Type: Plat Status: Passed
File created: 8/1/2018 In control: Planning Commission
On agenda: 8/8/2018 Final action: 8/8/2018
Title: 18PL1050 TRAIL BLAZER ADDITION, BLOCK 1, LOT 5 (FINAL - 13.150 ACRES) Located south of Yorktown and west of Waldron Road. Request for a Waiver of the Wastewater Infrastructure Construction Requirement in Section 8.2.7.A of the Unified Development Code (UDC), and an Exemption from Wastewater Lot/Acreage Fees in Accordance with Section 8.5.2.G of the UDC; a request for a Waiver from Sidewalk Construction Requirements in Section 8.2.2.A and Section 8.2.2.B of the Unified Development Code (UDC).
Sponsors: Development Services
Attachments: 1. 1. Wastewater Waiver & Exemption and Sidewalks (Trail Blazer plat) PC Memo 08.08.2018 PCMtg.pdf, 2. A. Trail Blazer Addition, Blk 1, Lt 5.Final.R1.pdf, 3. B. Laguna Madre WWTP Service Area 4- Exhibit 8.PDF, 4. C. TRAIL BLAZER WASTEWATER WAIVER & EXEMPTION and SIDEWALK.pdf

title

18PL1050

TRAIL BLAZER ADDITION, BLOCK 1, LOT 5 (FINAL - 13.150 ACRES)

Located south of Yorktown and west of Waldron Road.

 

Request for a Waiver of the Wastewater Infrastructure Construction Requirement in Section 8.2.7.A of the Unified Development Code (UDC), and an Exemption from Wastewater Lot/Acreage Fees in Accordance with Section 8.5.2.G of the UDC; a request for a Waiver from Sidewalk Construction Requirements in Section 8.2.2.A and Section 8.2.2.B of the Unified Development Code (UDC).