File #: 19-0532    Version: 1 Name:
Type: Motion Status: Passed
File created: 4/9/2019 In control: City Council
On agenda: 6/11/2019 Final action: 6/11/2019
Title: Motion awarding a design contract to Bath Engineering for the 2018 Bond Project for Elevator Modernization at Multiple Locations in the amount of $99,750 for design, bid and construction phase services to replace and upgrade five (5) elevators and corresponding equipment with funding available in various 2018 Bond Propositions.
Sponsors: Asset Management Department, Engineering Services
Attachments: 1. Agenda Memo - Elevator Modernization Multiple Locations (Bond 2018), 2. Budget - Elevator Modernization Multiple Locations (Bond 2018), 3. Location Map - Elevator Modernization Multiple Locations (Bond 2018), 4. Presentation - Elevator Modernization Multiple Locations (Bond 2018), 5. Contract - Elevator Modernization Multiple Locations (Bond 2018)

Title

Motion awarding a design contract to Bath Engineering for the 2018 Bond Project for Elevator Modernization at Multiple Locations in the amount of $99,750 for design, bid and construction phase services to replace and upgrade five (5) elevators and corresponding equipment with funding available in various 2018 Bond Propositions.